Documents

Menu

  • Fly Ash Reservoir

    Fugitive Dust Control Plan 9-21-2015
    Notification Of Intent to Close 10-22-2015
    Annual Engineering Inspection Report 12-31-2015
    Liner Design Certification 8-01-2016
    Initial Hazard Assessment Certification 8-01-2016
    Annual Fugitive Dust Report 9-30-2016
    Initial Design Flood Control Plan 10-09-2016
    Structural Stability Assessment 10-09-2016
    Safety Factor Assessment 10-09-2016
    History of Design and Construction 10-16-2016
    Initial Closure Plan 10-16-2016
    Initial Post-Closure Plan 10-16-2016
    Annual Engineering Inspection Report 1-10-2017
    Annual Fugitive Dust Report 09-29-2017
    Gavin FAR Groundwater Monitoring System Certification 10-18-2017
    Statistical Method PE Certification_Gavin_10-18-2017
    Annual Engineering Inspection Report 1-8-2018
    Annual Groundwater Monitoring and Corrective Action Report – 1-31-2018
    2018 Annual Meeting with LEPC-4-5-2018
    Annual Fugitive Dust Report 09-29-2018
    Location Restriction Report – 10-17-2018
    Annual Engineering Inspection Report 1-8-2019
    Annual Groundwater Monitoring and Corrective Action Report – 1-31-2019
    2019 Annual Meeting with LEPC-4-11-2019
    Annual Fugitive Dust Report -9-28-2019
    Annual Engineering Inspection Report 01-08-2020
    Annual Groundwater Monitoring and Corrective Action Report – 1-30-2020
    Demonstration for Closure Timeframe Extension 9-10-2020
    Annual Fugitive Dust Report – 09-28-2020
    Emergency Action Plan – 10-21-2020
    Annual Engineering Inspection Report 01-07-2021
    Annual Groundwater Monitoring and Corrective Action Report – 1-31-2021

  • Bottom Ash Pond

    Fugitive Dust Control Plan 9-21-2015
    Annual Engineering Inspection Report 12-31-2015
    Liner Design Certification 8-01-2016
    Initial Hazard Assessment Certification 8-01-2016
    Annual Fugitive Dust Report 9-30-2016
    Initial Design Flood Control Plan 10-09-2016
    Structural Stability Assessment 10-09-2016
    Safety Factor Assessment 10-09-2016
    History of Construction 10-16-2016, revised 4-15-2020
    Closure Plan 2020-04-15
    Post-Closure Plan 2020-04-15
    Annual Engineering Inspection Report 1-10-2017
    Annual Fugitive Dust Report 09-29-2017
    Gavin BAP Groundwater Monitoring System Certification 10-18-2017
    Statistical Method PE Certification_Gavin_10-18-2017
    Annual Engineering Inspection Report 1-8-2018
    Annual Groundwater Monitoring and Corrective Action Report – 1-31-2018
    2018 Annual Meeting with LEPC-4-5-2018
    Annual Fugitive Dust Report 09-29-2018
    Location Restriction Report – 10-17-2018
    Annual Engineering Inspection Report 1-8-2019
    Annual Groundwater Monitoring and Corrective Action Report – 1-31-2019 (Corrected)
    2019 Annual Meeting with LEPC-4-11-2019
    Annual Fugitive Dust Report -9-28-2019
    Annual Engineering Inspection Report 01-08-2020
    Annual Groundwater Monitoring and Corrective Action Report – 1-30-2020
    2020 Annual Meeting with LEPC 2-12-2020
    Annual Fugitive Dust Report – 09-28-2020
    Emergency Action Plan – 10-21-2020
    Site-Specific Alternative Deadline Demonstration to Initiate Closure 11-30-2020
    Annual Engineering Inspection Report 01-07-2021
    Annual Groundwater Monitoring and Corrective Action Report – 1-31-2021

  • Residual Waste Landfill